Sector Housing, private
Project type New build
Services provided Product / system manufacture
Project location South East England
Client Joshua Charles Developments Ltd
Consultant Canning Ericsson (design and build)
Contractor Canning Ericsson
Products used Thin Joint aircrete construction using Jumbo Bloks and Celfix Mortar, Celcon Foundation Blocks
 
 

Challenge

The developer adopted a fabric-first approach when it came to constructing this four-unit apartment block on a restricted site in order to meet the local planning requirements, which required a 25% reduction in CO2 emissions compared to Building Regulations (2010).

The scheme had to achieve Code for Sustainable Homes Level 4, so not only did it have to achieve very good thermal performance but good sound resistance and airtightness too. The development was also on a confined site, so the Celfix Mortar supplied dry, pre-mixed in bags, helped minimise material storage on site.

In addition to the scheme’s highly insulated building fabric, and as part of the planning requirement, photovoltaic panels were used to generate electricity from the sun on the roof of the project. This ensured that one apartment achieved an EPC A rating, with the remainder of the development achieving a B-rating.

Solution

This was the first time the contractor had used the H+H Thin Joint system for external wall construction, although Canning Ericsson had used H+H’s Jumbo Bloks for the construction of internal partitions on previous developments.

The Thin Joint system also worked well with the limited storage available on this tight site, which has been slotted into the end of the back garden of an existing home. Because of the restricted site storage, just-in-time deliveries of blocks were made by PBS, a local H+H aircrete stocking merchant.

Outcome

As the building’s fabric becomes more energy efficient, the amount of heat lost at junctions (e.g. walls/floors, corners) becomes increasingly significant. The y-value gives a value for the heat loss through the non-repeating thermal bridging areas of a building.

Using Accredited Construction Details with SAP (2005) enables a y-value of 0.08W/m2K to be used for heat loss calculations. However, using H+H’s Aircrete Construction Details enabled this figure to be reduced to 0.04W/m2K. This resulted in a significant reduction in CO2 emissions, equivalent to reducing the U-value of every external element by 0.04W/m2K.

“The scheme had to achieve Code for Sustainable Homes Level 4, so not only did we have to achieve very good thermal performance but good sound resistance and airtightness too; this appeared to be the best system to do this. Using Jumbo Bloks and the Thin Joint system was ideal, because the mortar comes bagged and can be mixed in buckets, so we didn’t have to have piles of sand and other materials lying around and taking up space. The Jumbo Bloks are lightweight and they are relatively easy to cut and shape when compared to a dense block. It definitely saved time. I’d use it again.”

Michael Alderton, Director, Canning Ericsson


Challenge

The developer adopted a fabric-first approach when it came to constructing this four-unit apartment block on a restricted site in order to meet the local planning requirements, which required a 25% reduction in CO2 emissions compared to Building Regulations (2010).

The scheme had to achieve Code for Sustainable Homes Level 4, so not only did it have to achieve very good thermal performance but good sound resistance and airtightness too. The development was also on a confined site, so the Celfix Mortar supplied dry, pre-mixed in bags, helped minimise material storage on site.

In addition to the scheme’s highly insulated building fabric, and as part of the planning requirement, photovoltaic panels were used to generate electricity from the sun on the roof of the project. This ensured that one apartment achieved an EPC A rating, with the remainder of the development achieving a B-rating.

Solution

This was the first time the contractor had used the H+H Thin Joint system for external wall construction, although Canning Ericsson had used H+H’s Jumbo Bloks for the construction of internal partitions on previous developments.

The Thin Joint system also worked well with the limited storage available on this tight site, which has been slotted into the end of the back garden of an existing home. Because of the restricted site storage, just-in-time deliveries of blocks were made by PBS, a local H+H aircrete stocking merchant.

Outcome

As the building’s fabric becomes more energy efficient, the amount of heat lost at junctions (e.g. walls/floors, corners) becomes increasingly significant. The y-value gives a value for the heat loss through the non-repeating thermal bridging areas of a building.

Using Accredited Construction Details with SAP (2005) enables a y-value of 0.08W/m2K to be used for heat loss calculations. However, using H+H’s Aircrete Construction Details enabled this figure to be reduced to 0.04W/m2K. This resulted in a significant reduction in CO2 emissions, equivalent to reducing the U-value of every external element by 0.04W/m2K.

“The scheme had to achieve Code for Sustainable Homes Level 4, so not only did we have to achieve very good thermal performance but good sound resistance and airtightness too; this appeared to be the best system to do this. Using Jumbo Bloks and the Thin Joint system was ideal, because the mortar comes bagged and can be mixed in buckets, so we didn’t have to have piles of sand and other materials lying around and taking up space. The Jumbo Bloks are lightweight and they are relatively easy to cut and shape when compared to a dense block. It definitely saved time. I’d use it again.”

Michael Alderton, Director, Canning Ericsson


 
 
 
Downloads
  • H+H Thin-Joint System
    H+H Thin-Joint System
    5.65MB
    Download
  • Products & Applications Guide
    Products & Applications Guide
    5.76MB
    Download
  • Factsheet 12 - LGS versus thin-joint masonry
    Factsheet 12 - LGS versus thin-joint masonry
    7pp 1.61MB
    Download
  • New apartments, Brighton: a fabric-first approach
    New apartments, Brighton: a fabric-first approach
    4pp 1.12MB
    Download


Related entries

  • H+H UK: Celcon Thin-Joint system for aircrete blockwork
    Celcon Thin-Joint system for aircrete blockwork
    H+H UK
    The Celcon Thin-Joint system combines Celcons Plus Block range of accurately dimensioned, aircrete blocks with Celfix, a specially developed thin-layer mortar. It is a classified modern method of construction (MMC), and has NHBC approval. Celfix mortar is cement-based and supplied as a dry powder in 25kg bags. It has been designed to replace the...
    Product, 29 June 2017
  • H+H UK: H+H aircrete blocks & Thin Joint system, Craven Gardens
    H+H aircrete blocks & Thin Joint system, Craven Gardens
    H+H UK
    Williams Homes used H+H Jumbo Bloks and H+H Celcon Blocks with Thin Joint Celfix mortar to build Craven Gardens, an exclusive development of eight detached four and five bedroom homes located in the historic market town of Melton Mowbray. The homes are designed to combine modern materials with energy efficient, low maintenance construction. H+H...
    News, 06 November 2012
  • H+H UK: Light Gauge Steel vs Thin-joint Masonry
    Light Gauge Steel vs Thin-joint Masonry
    H+H UK
    Davis Langdon were commissioned by H+H UK Ltd to undertake a study to provide a detailed comparison between Light Gauge Steel (LGS) Frame construction and H+H UK Ltd thin-joint masonry construction using aircrete units. The study focused on a comparison of costs, together with speed of build, programme, robustness, thermal mass and other benefits...
    News, 11 October 2012
  • H+H UK: Thin-joint system used for low energy apartment block
    Thin-joint system used for low energy apartment block
    H+H UK
    H+H’s Thin Joint system has been used in a fabric-first approach to the design and construction of a low energy apartment block on a constrained site in Brighton. The planners insisted the four-apartment scheme had to comply with Level 4 for the Code for Sustainable Homes. This demanded a 25% reduction in CO2 emissions when compared to Building...
    News, 05 February 2015