- Sector
- Industrial
- Services provided
- Site survey
- Planning advice
- Design
- Product / system manufacture
- Product / system supply
- Installation
- Client
- Eaton MEDC
- Products used
- Anchorwall
Context
Westgate Global supplied and installed Anchorwall industrial partitioning to create a dedicated welding enclosure to meet stringent health and safety requirements at Eaton MEDC's facility.
The existing open-plan layout provided no defined area for welding activity, presenting both safety and operational concerns. The enclosure needed to be structurally secure, visually accessible, and compliant with internal safety standards.
Project detail
Westgate Global supplied and installed a custom Anchorwall system to create a defined, part-height welding enclosure. The solution used single-skin Anchorwall panels, selected for their durability and ease of installation in an active production environment.
The enclosure measured 43 linear metres by 15.7 linear metres and was designed to be secured to the floor, providing a stable and fixed structure.
Key features
Vision panels throughout for clear visibility and supervision of welding operations
Standard ‘H’ strips to securely join panels with a clean, modular finish
Intermediate mullions to provide support and maintain structural integrity
Channel top capping to ensure rigidity and deliver a neat, uniform appearance across the top of the enclosure
Result
The Anchorwall enclosure provided Eaton MEDC with a safe, designated space for welding activities, supporting compliance with Health and Safety regulations while minimising disruption to the surrounding workspace. The installation combined robustness with functionality, offering both protection and visibility – crucial for operations requiring oversight.
With Anchorwall’s modularity and clean aesthetic, the enclosure blends seamlessly into the wider facility, delivering a professional and compliant solution tailored to the client’s needs.




