Context
Following the successful completion of Great Eastern Quays Phase 2, also delivered for Vistry Partnerships, BA Systems was brought on board to contribute to the transformation of Gallions Reach in the heart of Royal Albert Wharf. The project represents the next phase of an ambitious regeneration programme in London’s Docklands.
The development consists of 241 contemporary flats across three distinct residential buildings. Building upon the strong working relationship established during earlier phases, BA Systems entered into a detailed pre-construction process to review, refine and enhance the design of the architectural metalwork for this phase.
Pre-construction collaboration
BA Systems’ involvement from the early stages of the project allowed for a proactive approach to design and coordination. Drawing on lessons learned from previous phases, the company worked closely with the design team to rationalise the architectural details and identify areas for improvement. By integrating best practice and practical insights from prior experience, it was able to streamline the specification and ensure that the architectural vision was realised with efficiency and precision.
The design process was driven by collaboration. Using advanced 3D CAD modelling software, BA Systems developed accurate, detailed models of the proposed balustrade systems, enabled potential clashes to be identified early on. This approach was particularly critical in resolving the complex interfaces around the inset balconies, where the models highlighted key interactions with coping details, masonry support bracketry, and drainage outlets. The integration of these elements required careful coordination, which the modelling process facilitated, ensuring a smooth installation process.
Scope of work
BA Systems’ scope on this phase was extensive, with a range of different balcony and façade elements contributing to the overall aesthetic and functionality of the buildings. Work included:
50m of B50 Juliette balconies
370m of a combination of balustrades with solid panels and fascia-mounted B50 balustrades for the projecting balconies
32m of privacy screens
22 canopies
900m of B50 inset balcony balustrades
Each of these elements was delivered to the highest standard, with the B50 balustrade system selected for its durability, clean lines and minimal maintenance requirements. The seamless integration of solid panels into the balustrades enhanced the buildings' visual appeal while providing privacy and wind protection for residents.
Installation and project management
The successful delivery of such a multifaceted project required not only design expertise but also efficient project management and skilled installation. To ensure the highest quality of execution, BA Systems appointed a dedicated project manager and supporting site manager to oversee the works from start to finish. Working alongside the company's experienced installation team, the project manager ensured that every aspect of the project ran smoothly, from the coordination of on-site activities to the meticulous installation of each balcony and screen.
Outcome
BA Systems' commitment to collaboration, precision and quality ensured that the Gallions Reach development was delivered on time and to the satisfaction of Vistry Partnerships. As with its work on Great Eastern Quays, this project stands as a testament to BA Systems’ ability to deliver complex architectural metalwork solutions on large-scale residential developments.