The project

Having previously worked with Westgate to provide site offices and welfare facilities, Multiplex reached out to Westgate again to provide Hoardfast, a quality temporary internal hoarding solution, during the initial phases of the Marble Arch Place project.

Multiplex had established off-site offices and welfare facilities, but as the project progressed there was a need to relocate site facilities to the construction site itself. Multiplex are passionate about ensuring on-site employees have excellent working conditions, offices and welfare facilities that maximise productivity and motivation.

The solution

For this project, Multiplex were supplied with 220 linear metres of Hoardfast Firescreen, a 60 minute fire rated panel, and 30 linear metres of Hoardfast Budget, a cost effective solution for creating temporary internal walls. Both products formed their internal site office and welfare facilities, including a canteen and break area, separate male and female toilets, offices, meeting rooms and a prayer room.

As Hoardfast was being used at the slab-to-slab construction phase of the project, Multiplex required a temporary hoarding system that could achieve a 1-hour fire rating as well as offer insulation properties to ensure the offices and welfare facilities were weather-proof.

Multiplex also chose Hoardfast as they required a solution that could be installed and then relocated and reconfigured to suit additional project phases. Hoardfast site rooms also help with CDM compliance, have hire and purchase options, a variety of panel, height and support options and can be configured to suit the specific project requirements.

In order to minimise waste on-site and reduce the environmental impact of this construction project it was also important that the hoarding could be diverted from landfill and recycled at the end of the project. Westgate worked with Multiplex to ensure that at the end of the project panels could be demounted and returned to Westgate for recycling.

Client feedback

“Hoardfast is a great product that helps us to get set up on site quickly and efficiently throughout the project phases, the service is second to none and we always have a personal contact within Westgate to help support our requirements for the project”.


The project

Having previously worked with Westgate to provide site offices and welfare facilities, Multiplex reached out to Westgate again to provide Hoardfast, a quality temporary internal hoarding solution, during the initial phases of the Marble Arch Place project.

Multiplex had established off-site offices and welfare facilities, but as the project progressed there was a need to relocate site facilities to the construction site itself. Multiplex are passionate about ensuring on-site employees have excellent working conditions, offices and welfare facilities that maximise productivity and motivation.

The solution

For this project, Multiplex were supplied with 220 linear metres of Hoardfast Firescreen, a 60 minute fire rated panel, and 30 linear metres of Hoardfast Budget, a cost effective solution for creating temporary internal walls. Both products formed their internal site office and welfare facilities, including a canteen and break area, separate male and female toilets, offices, meeting rooms and a prayer room.

As Hoardfast was being used at the slab-to-slab construction phase of the project, Multiplex required a temporary hoarding system that could achieve a 1-hour fire rating as well as offer insulation properties to ensure the offices and welfare facilities were weather-proof.

Multiplex also chose Hoardfast as they required a solution that could be installed and then relocated and reconfigured to suit additional project phases. Hoardfast site rooms also help with CDM compliance, have hire and purchase options, a variety of panel, height and support options and can be configured to suit the specific project requirements.

In order to minimise waste on-site and reduce the environmental impact of this construction project it was also important that the hoarding could be diverted from landfill and recycled at the end of the project. Westgate worked with Multiplex to ensure that at the end of the project panels could be demounted and returned to Westgate for recycling.

Client feedback

“Hoardfast is a great product that helps us to get set up on site quickly and efficiently throughout the project phases, the service is second to none and we always have a personal contact within Westgate to help support our requirements for the project”.


 
 
 
Downloads
  • Hoardfast Firescreen Fact Sheet
    Hoardfast Firescreen Fact Sheet
    947.78KB
    Download
  • Hoardfast Budget Fact Sheet
    Hoardfast Budget Fact Sheet
    2MB
    Download
 
 
 
Enquire
 

Related entries

  • Westgate Global: Hoardfast Budget PVC temporary hoarding
    Hoardfast Budget PVC temporary hoarding
    Westgate Global
    Hoardfast Budget PVC is a basic, quick to install, modular, fixed, floor-to-ceiling internal screening system. Panels are available in a range of heights and can be easily configured to create a temporary internal partition wall.
  • Westgate Global: Hoardfast Firescreen 60-minute fire resistant hoarding
    Hoardfast Firescreen 60-minute fire resistant hoarding
    Westgate Global
    Hoardfast Firescreen is a quick to install, modular, internal screening system that can be used free-standing with Westgate’s unique weighted universal support or fixed floor-to-ceiling. Available in a range of heights, Hoardfast...

Also by Westgate Global

Westgate Global address and contact details

Westgate Global Limited
Westgate House
Common Road Industrial Estate
Verulam Road
Stafford
ST16 3EA
Tel: 01785 242181
View on map
 
Follow Westgate Global
 
Not found what you're looking for? View other options