Contiguous piles have many advantages in the formation of a retaining wall. This method of construction involves the creation of a line of deep bores that are then backfilled with concrete. The advantage of this method of construction is that it is possible to support the adjacent structure before bulk excavation takes place. Contiguous piles are particularly suited to sites with restricted access.

Contiguous piling

Of all the methods of piling, it is typically the most cost-effective and least time-consuming. The wall consists of individual piles typically installed at centres 150mm greater than their diameter. This means that there are gaps between the piles and therefore contiguous piles are suitable only where the groundwater table is permanently below excavation level.

Even above the water table, below ground structures can be subject to water pressure. Surface water run-off, perched water tables and defective water mains can all lead to significant water ingress. It is very important that the below ground structure acts as the first line of defence from a waterproofing perspective.

The waterproofing of contiguous piles can often be challenging. It is not possible to rely on a waterproof additive in the piles themselves. Likewise it is not possible to waterproof the pile externally.

Cavity drainage membranes are the most reliable and effective method of waterproofing basement spaces however, when used as the only waterproofing system with contiguous piled walls, special attention is required. It is important to minimise the workload of the groundwater drainage system and any pumps. Also, it is crucial that earth from between the piles does not wash out into the drainage system and cause blockages.

It is therefore important to maximise the structural water-tightness of the wall. This can be achieved using a poured or a spray concrete liner in front of the piles.

New-build residential

In recent years the structural warranty providers have begun to recognise the importance of effective waterproofing design. NHBC in chapter 5.4 states that where grade 3 protection is required where “below ground wall retains more than 600mm, measured from the lowest finished floor level, the waterproofing design should include a combination of two of the Types of waterproofing systems.”

This secondary waterproofing system would need to be internal, again it would not be possible to waterproof the outside of the piles.

Koster NB1 is a high-performance migratory crystalline slurry that not only acts as physical barrier but also acts to waterproof the substrate itself. The NB1 slurry can be spray- or brush-applied to a concrete liner wall formed in front of the piles and continued across the structural slab before the installation of the cavity drainage membrane.

An alternative would be to use the Delta Dualproof membrane. This is a pre-applied external waterproof system but is suitable in this application as it can be 'sandwiched' between the piles and a poured concrete liner. The face of the piles would need to be levelled before application by filling the cusps with mortar before the DualProof is applied. A concrete liner wall is then cast onto the DualProof waterproofing barrier.

Capping beam

A concrete ring is formed at the top of the piles in order to link them together. This is typically larger than the piles and will extend into the building space. This will also need to be waterproofed if it is below the external ground level. Koster NB1 mineral slurry can be used to effectively waterproof the ring beam.

Delta Membrane’s knowledgeable Technical Team offers an on hands approach to help with the waterproofing designs for any project.


Contiguous piles have many advantages in the formation of a retaining wall. This method of construction involves the creation of a line of deep bores that are then backfilled with concrete. The advantage of this method of construction is that it is possible to support the adjacent structure before bulk excavation takes place. Contiguous piles are particularly suited to sites with restricted access.

Contiguous piling

Of all the methods of piling, it is typically the most cost-effective and least time-consuming. The wall consists of individual piles typically installed at centres 150mm greater than their diameter. This means that there are gaps between the piles and therefore contiguous piles are suitable only where the groundwater table is permanently below excavation level.

Even above the water table, below ground structures can be subject to water pressure. Surface water run-off, perched water tables and defective water mains can all lead to significant water ingress. It is very important that the below ground structure acts as the first line of defence from a waterproofing perspective.

The waterproofing of contiguous piles can often be challenging. It is not possible to rely on a waterproof additive in the piles themselves. Likewise it is not possible to waterproof the pile externally.

Cavity drainage membranes are the most reliable and effective method of waterproofing basement spaces however, when used as the only waterproofing system with contiguous piled walls, special attention is required. It is important to minimise the workload of the groundwater drainage system and any pumps. Also, it is crucial that earth from between the piles does not wash out into the drainage system and cause blockages.

It is therefore important to maximise the structural water-tightness of the wall. This can be achieved using a poured or a spray concrete liner in front of the piles.

New-build residential

In recent years the structural warranty providers have begun to recognise the importance of effective waterproofing design. NHBC in chapter 5.4 states that where grade 3 protection is required where “below ground wall retains more than 600mm, measured from the lowest finished floor level, the waterproofing design should include a combination of two of the Types of waterproofing systems.”

This secondary waterproofing system would need to be internal, again it would not be possible to waterproof the outside of the piles.

Koster NB1 is a high-performance migratory crystalline slurry that not only acts as physical barrier but also acts to waterproof the substrate itself. The NB1 slurry can be spray- or brush-applied to a concrete liner wall formed in front of the piles and continued across the structural slab before the installation of the cavity drainage membrane.

An alternative would be to use the Delta Dualproof membrane. This is a pre-applied external waterproof system but is suitable in this application as it can be 'sandwiched' between the piles and a poured concrete liner. The face of the piles would need to be levelled before application by filling the cusps with mortar before the DualProof is applied. A concrete liner wall is then cast onto the DualProof waterproofing barrier.

Capping beam

A concrete ring is formed at the top of the piles in order to link them together. This is typically larger than the piles and will extend into the building space. This will also need to be waterproofed if it is below the external ground level. Koster NB1 mineral slurry can be used to effectively waterproof the ring beam.

Delta Membrane’s knowledgeable Technical Team offers an on hands approach to help with the waterproofing designs for any project.


Interested in this article?
Call 01992 523523
OR
 
 
 
Enquire
 


Related entries

  • Delta Membrane Systems: Waterproofing – BS 8102: 2009 and cavity drain membranes
    Waterproofing – BS 8102: 2009 and cavity drain membranes
    Delta Membrane Systems
    This course aims to explore waterproofing, and in particular the use of cavity drain and air gap membranes in a variety of different situations from domestic basements to London Underground stations

Also by Delta Membrane Systems

Delta Membrane Systems address and contact details

Delta Membrane Systems Ltd
DELTA House
Merlin Way
North Weald
Epping
CM16 6HR
Tel: 01992 523523
Fax: 01992 523250
View on map
 
Follow Delta Membrane Systems
 

Ask Delta Membrane Systems about

Waterproofing of contiguous piles