Sector Education
Project type New build
Services provided Product / system manufacture
Product / system supply
Installation
Year completed 2013
Project location Yorkshire and The Humber
Client Bradford University
Consultant Landscape architect - Margaret Twigg Landscape Design; Architect - Farrell and Clark
Contractor Main - GB Building Solutions; green roof - Geogreen Solutions
Products used Roofdrain; green roof components
 
 

Challenge

Bradford University’s Sustainable Enterprise Centre (SEC) is a 4-storey, 2,000m2, £5.2m building. It contains workshops, business units, an open-plan office and a multi-function space, all of which will provide learning facilities and teaching resources aimed at promoting sustainable living.

Given the nature of the project it was important from the outset that the building and its construction embraced sustainability, including its green roof.

Solution

ABG undertook the green roof package as a turnkey solution offering design, installation and on-going maintenance. The roof was installed during a two week period in July 2013 by ABG’s in-house installer, Geogreen Solutions.

The green roof installation comprised a biodiverse finish, including specially designed features to encourage the development of flora and fauna on the roofing area. Lightweight growing media was used to minimise the roof loadings whilst providing a nutritionally rich base for the specially selected vegetation. Beneath this surface finish Roofdrain drainage composite was used to create a free-draining void that also allows for the storage of collected rainwater to irrigate the vegetation during dry periods.

The biodiverse green roof on this project highlighted how ABG’s in-house technical expertise and on-site installation experience can provide the client with a solution that maximises the potential BREEAM rating in relation to the green roof element of the building.

Outcome

ABG helped the design and construction team on Bradford University’s Sustainable Enterprise Centre project to achieve the world’s highest pre-construction BREEAM score of 94.95%, with its biodiverse, green roof installation.

BREEAM stands for the Building Research Establishment’s Environmental Assessment Method. It is an assessment method based on performance to set standards for best practice in sustainable design. Credits are awarded in ten categories and then added together to produce a single overall score which is then given a rating of Unclassified (below 30%), Pass (above 30%), Good (above 45%), Very Good (above 55%), Excellent (above 70%), and Outstanding (above 85%).

Inclusion of a green roof is relevant to BREEAM primarily within the Land Use and Ecology section, although it does also impact directly other considerations including flood risk mitigation and indirectly in thermal comfort, acoustic performance, materials specification, hard landscaping, responsible sourcing of materials, insulation, construction site impact, and waste management.

Biodiverse and extensive green roofs are commonly used to replicate and enhance the number of native or beneficial plant species present on site before the construction process in order to gain credits and a suitably qualified Ecological Consultant is required to oversee the process.

Green roof maintenance or habitat management becomes relevant to BREEAM by the Habitat Management Plan, put in place to safeguard the enhancement of site ecology and long-term impact on biodiversity.


Challenge

Bradford University’s Sustainable Enterprise Centre (SEC) is a 4-storey, 2,000m2, £5.2m building. It contains workshops, business units, an open-plan office and a multi-function space, all of which will provide learning facilities and teaching resources aimed at promoting sustainable living.

Given the nature of the project it was important from the outset that the building and its construction embraced sustainability, including its green roof.

Solution

ABG undertook the green roof package as a turnkey solution offering design, installation and on-going maintenance. The roof was installed during a two week period in July 2013 by ABG’s in-house installer, Geogreen Solutions.

The green roof installation comprised a biodiverse finish, including specially designed features to encourage the development of flora and fauna on the roofing area. Lightweight growing media was used to minimise the roof loadings whilst providing a nutritionally rich base for the specially selected vegetation. Beneath this surface finish Roofdrain drainage composite was used to create a free-draining void that also allows for the storage of collected rainwater to irrigate the vegetation during dry periods.

The biodiverse green roof on this project highlighted how ABG’s in-house technical expertise and on-site installation experience can provide the client with a solution that maximises the potential BREEAM rating in relation to the green roof element of the building.

Outcome

ABG helped the design and construction team on Bradford University’s Sustainable Enterprise Centre project to achieve the world’s highest pre-construction BREEAM score of 94.95%, with its biodiverse, green roof installation.

BREEAM stands for the Building Research Establishment’s Environmental Assessment Method. It is an assessment method based on performance to set standards for best practice in sustainable design. Credits are awarded in ten categories and then added together to produce a single overall score which is then given a rating of Unclassified (below 30%), Pass (above 30%), Good (above 45%), Very Good (above 55%), Excellent (above 70%), and Outstanding (above 85%).

Inclusion of a green roof is relevant to BREEAM primarily within the Land Use and Ecology section, although it does also impact directly other considerations including flood risk mitigation and indirectly in thermal comfort, acoustic performance, materials specification, hard landscaping, responsible sourcing of materials, insulation, construction site impact, and waste management.

Biodiverse and extensive green roofs are commonly used to replicate and enhance the number of native or beneficial plant species present on site before the construction process in order to gain credits and a suitably qualified Ecological Consultant is required to oversee the process.

Green roof maintenance or habitat management becomes relevant to BREEAM by the Habitat Management Plan, put in place to safeguard the enhancement of site ecology and long-term impact on biodiversity.


Interested in this case study?
Call 01484 852096
OR
 
 
 
Downloads
  • Green Roofs Guide
    Green Roofs Guide
    13pp 1.96MB
    Download
  • Case study - Bradford University
    Case study - Bradford University
    2pp 247.8KB
    Download
 
 
 
Enquire
 


Related entries

  • ABG Geosynthetics: Roofdrain - geocomposite drainage for green roof systems
    Roofdrain - geocomposite drainage for green roof systems
    ABG Geosynthetics
    Roofdrain is designed for use in extensive green roof systems, providing both drainage and attenuation in a convenient, lightweight and cost effective system. The drainage design of intensive green roofs requires only a...

Also by ABG Geosynthetics

ABG Geosynthetics address and contact details

ABG Ltd
E7 Meltham Mills Road
Maltham
Holmfirth
HD9 4DS
Tel: 01484 852096
Fax: 01484 851562
View on map
 
Follow ABG Geosynthetics
 
Not found what you're looking for? View other options

Ask ABG Geosynthetics about

Biodiverse green roof - Bradford University