CPS has now supplied Liverpool University with seating and staging for over 45 years and recently installed a demountable tiered seating structure for the institution's newly renovated Performing Arts Centre.

The structure included 8 tiers and incorporated the new Rapid Lock™ System - a stage connecting mechanism that makes it quicker and more efficient to connect.

The demountable structure also incorporated CPS' Alu Rapid V-leg casting, which gives the staging the capability to be built up to 1.68m without the need for bracing.


CPS has now supplied Liverpool University with seating and staging for over 45 years and recently installed a demountable tiered seating structure for the institution's newly renovated Performing Arts Centre.

The structure included 8 tiers and incorporated the new Rapid Lock™ System - a stage connecting mechanism that makes it quicker and more efficient to connect.

The demountable structure also incorporated CPS' Alu Rapid V-leg casting, which gives the staging the capability to be built up to 1.68m without the need for bracing.


 
 
 
Enquire
 

Related entries

  • CPS Manufacturing Co: Alu Rapid demountable staging
    Alu Rapid demountable staging
    CPS Manufacturing Co
    The Alu Rapid is the core CPS platform with removable legs, it is easy to assemble and dismantle while being extremely compact to store. The Alu Rapid has a massive 765kg/m2 loading capacity which makes the system is very...

Also by CPS Manufacturing Co

CPS Manufacturing Co address and contact details

CPS Manufacturing Co LLP
Brunel House
Brunel Close
Harworth
Doncaster
DN11 8QA
Tel: 01302 741888
View on map
 
Follow CPS Manufacturing Co