1-15 of 23

Lang+Fulton

   Edinburgh, EH28 8PJ   View on map
Call 0131 441 1255   Visit website
  • Lang+Fulton: Green wall cladding to MSCP, New Covent Garden
    Green wall cladding to MSCP, New Covent Garden
    Lang+Fulton
    The refurbishment of the car park was one of the first steps in the regeneration of New Covent Garden Market; a project which is projected to take 10 years at a cost of £2 billion. Appropriately for a flower and fruit...
  • Lang+Fulton: Louvred screening of roof-top plant at Glasgow hotel
    Louvred screening of roof-top plant at Glasgow hotel
    Lang+Fulton
    Dakota Glasgow is a remarkable conversion of a redundant office block. The hotel is situated within the old financial and commercial centre of the city, and is surrounded by many listed Georgian buildings. Planning...
  • Lang+Fulton: Architectural steel grating - Here East, London
    Architectural steel grating - Here East, London
    Lang+Fulton
    The transformation of the former Olympic Broadcast Centre at Here East is almost complete. The vision is to create a 1.2 million square foot technical, digital and creative centre in East London alongside new facilities for...
  • Lang+Fulton: Louvred screening at marina's new spa and leisure centre
    Louvred screening at marina's new spa and leisure centre
    Lang+Fulton
    Lang+Fulton was asked to supply louvred screening to provide shelter and a visual barrier to the café and outdoor pool areas of Portavadie Marina Resort's new 10m spa and leisure centre in Argyll. A 2.5m high screen of...
  • Lang+Fulton: Caledonian University: plant housing and waste storage
    Caledonian University: plant housing and waste storage
    Lang+Fulton
    A £32 million campus redevelopment at Glasgow Caledonian University, designed by Page/Park Architects, included a screened area within an undercroft. The plant housing and waste storage bays utilised DeltaWing-90 louvres to...
  • Lang+Fulton: Roof-top screening at Dunfermline High School
    Roof-top screening at Dunfermline High School
    Lang+Fulton
    Dunfermline High School has a historic past. In 1128, when Dunfermline was the capital of Scotland, King David I endowed a school as part of Dunfermline Abbey. It was formally founded as a separate institution in 1468.
  • Lang+Fulton: Piazza screening for BAA Heathrow Academy
    Piazza screening for BAA Heathrow Academy
    Lang+Fulton
    The Heathrow Academy is situated adjacent to the busy A4 and is home to a small exhibition space. In order to create a calmer environment for the public a 7.0m high screen projects on either side of the building. The lower...
  • Lang+Fulton: Leisure facility cladding - Antelope Park, Southampton
    Leisure facility cladding - Antelope Park, Southampton
    Lang+Fulton
    Covering an area of 2 hectares, Antelope Park in Southampton was once described as a "run-down site exuding a forbidding ambience". Now, at a cost of £25 million, HGP Architects has designed an impressive 16,000 m2 retail...
  • Lang+Fulton: Car park screening - Portlaoise urban park
    Car park screening - Portlaoise urban park
    Lang+Fulton
    The new urban park at Portlaoise includes a performance space and recreation area. A low-level car park – which forms an intrinsic part of the development – required cladding that looked architecturally pleasing whilst...
  • Lang+Fulton: Car park cladding - Silverburn shopping centre, Glasgow
    Car park cladding - Silverburn shopping centre, Glasgow
    Lang+Fulton
    Silverburn is a new 100,000m2 shopping centre, anchored by Tesco, Next, Marks & Spencer and Debenhams located in the Pollock area of Glasgow. The centre has convenient motorway access and provides parking for 4,500 vehicles.
  • Lang+Fulton: Custom-sized cladding panels - The Rock, Bury
    Custom-sized cladding panels - The Rock, Bury
    Lang+Fulton
    The Rock is a 1.6million sq/ft mixed-use development aimed at regenerating the town centre of Bury. The £350 million project includes shops, restaurants, cinema, bowling alley, parking space and residential units.
  • Lang+Fulton: Terra-34 grating for Edinburgh Sculpture Workshop
    Terra-34 grating for Edinburgh Sculpture Workshop
    Lang+Fulton
    The Edinburgh Sculpture Workshop is at the forefront of a productive and exciting Scottish visual arts industry, providing key elements of the visual arts infrastructure through a range of facilities and professional...
  • Lang+Fulton: Pressure-locked grating panels - The Centre, Livingston
    Pressure-locked grating panels - The Centre, Livingston
    Lang+Fulton
    Livingston boasts one of the largest indoor shopping and leisure complexes in Scotland. After major refurbishment and development, The Centre was recently reopened as a contemporary-styled, modern complex, accommodating over...
  • Lang+Fulton: Multi-storey car park screening -  Manchester University
    Multi-storey car park screening - Manchester University
    Lang+Fulton
    Manchester University’s eight-storey car park was built as part of the swimming pool complex for the Commonwealth Games in 2002. Grating panels were specified for the facade cladding, to make sure enough light and air could...
  • Lang+Fulton: Car park screening - Marischal College, Aberdeen
    Car park screening - Marischal College, Aberdeen
    Lang+Fulton
    Marischal College is situated in a prime location in the historic city centre of Aberdeen. The City Council have leased and fully redeveloped and refurbished the Grade A listed building from the University for use as office...